Brian > Onto the next step
Brian > Ready for paint and then drop ceiling.
Brian > Now onto fixing the ceiling
Brian > Bathroom ready for paint
Brian > Drywall is done
Brian > Ready for paint
Brian > Drywall is done in sewing room
Brian > The area (full of crap currently) will be our "outdoor pub area".  This will include a pub table and stools with a pendant light above said table.  The door to the closet will be a glass door with an awening above it and a sconce to the right.  We are hoping to have a mural painted along the back wall to give that outside cafe feel.
Brian > Basement powder room with rough-in valve installed and drywall hung.
Onto the next step
Brian > Onto the next step
Onto the next step
See photo in gallery

Comments

|

New comment:

Name: Email: Link:


To foil spammers, enter this code: copy this text in this box: Code unreadable?